Process Documentation Agent
Keeps operating procedures written and current.
SpecifiedThis agent is written in full, with its settings, rules, approver and outputs, but we have not yet run it. It is not yet in use with a client. About the levels
- Industry
- IT Company
- Department
- Management
- Team
- Operations Coordination
- Kind
- Assistant
- Maturity
- Specified
- Approver
- Chief Information Security Officer
- Code
- MGT-12
It writes and keeps current the company's operating procedures: delivery and change management, incident handling, onboarding to client projects, access reviews and the procedures behind its ISO 27001 and SOC 2 controls. It proposes revisions as drafts, maps each to the controls it evidences, and holds any change to a control procedure until the security officer approves it.
How it works
6 steps, and a person signs off before step 6.
- 01Looks it up
Finds the record the request is about in the project management tool: the current procedure page, its revision history, owner and linked control references..
- 02Reads the request
Works out what is being asked and what a complete answer needs.
- 03Checks the facts
Checks figures, dates and rules against the source records, not from memory.
- 04Works it through
Prepares the draft, match, recommendation or reply, with its sources.
- 05Asks a person
Hands the work to Chief Information Security Officer with its reasoning before anything goes out.
- 06Acts
Once approved, it acts in the project management tool: it creates the revised procedure as a draft page with its control mapping and review date. and records what was done.
What it works with
Your knowledge, your systems, your people.
Knows
The procedure library: current procedures and their owners, the review schedule, the ISO 27001 Annex A and SOC 2 control mapping, the style guide and the last audit findings.
Reads from
the project management tool: the current procedure page, its revision history, owner and linked control references.
Acts in
the project management tool: it creates the revised procedure as a draft page with its control mapping and review date.
Hands back
An object with title, version, owner, purpose, steps (a list, each with number, role, action and record_kept), controls (a list of references), changes_from_last (a list), next_review and flags (a list).
Asks a person when
The revision changes a procedure mapped to a security control while on is true, or the described practice breaks a control.
Settings
Your limits, set by your managers.
| Setting | Default | What it controls |
|---|---|---|
| Review every (months) | 12 | A procedure not reviewed within this is flagged overdue. |
| Most steps in one procedure | 15 | Longer procedures are split into linked ones. |
| Control procedures need the security officer | On | When on, a change to a procedure mapped to a security control waits for the approver. |
| Next external audit date | see the audit calendar | Revisions answering an audit finding are prioritised before this date. |
Limits are settings, not code: a manager changes them without a developer.
Rules it always follows
- Write each step as one action with its role, input and output; at most 15 steps, otherwise split.
- Map each procedure to the controls it evidences and keep the mapping current; never remove a control mapping without saying why.
- When on is true, a change to a control-mapped procedure waits for the Chief Information Security Officer.
- Flag a procedure not reviewed in 12 months as overdue.
- Revisions that close an audit finding come first, ahead of see the audit calendar.
- Document what the teams actually do; where the request describes a practice that breaks a control, flag it instead of writing it down.
See the Process Documentation Agent on your own work.
We’ll run it on a sample of your work and show you what your approver would see.